The roof drain should always be set onto the base of the roof structure unless otherwise specified by a roofing materials manufacture or project engineer. After the drain is secured into place using the Underdeck Clamp Kit, the roof would then be flashed (waterproofed). The insulation, other roofing materials and finishes are set into place according to the roofing materials manufacturer or the project engineer.